1998

YAPIRAY is established by Yapı Merkezi

2000

First Tamping Work, Bursaray
40.300 m

İzmir Metro
23.200 m

2002

Kadıköy - Moda Nostalgic Tramway
2.938 m

2004

First Track Laying Project on Galata Opening Bridge, Eminönü - Kabataş Project
1.187 m

2005

First Special Design Work, Marmaray BC1

Eskişehir Tramway Project
32.550 m

UITP World Light System Award with Eskişehir Tramway

2006

Zeytinburnu - Bağcılar Tramway Line
11.500 m

Track Construction of Taksim - Kabataş Funicular Line
1.280 m

2007

Ankara Metro Track Works
31.000 m

First Track Panel Prefabrication Project for Ankara - Istanbul
234.000 m

Kemalpaşa - Turgutlu Track and Turnout Works

2008

Sultançiftliği - Edirnekapı Tramway
30.600 m

2009

Konya Tramway
4.600 m

Kayseri Light Rail Project
35.630 m

UITP World Light System Award with Kayseray

2009

Rayton Concrete Sleeper Production to the Papua Indonesia Island for the Grasberg Railway Project

Eskişehir - İnönü High Speed Train Project
11.200 m

First Railway Sleeper Production

2010

Casablanca Tramway
40.000 m

Caroubier Storage Area
10.000 m

Bursaray Light Metro System
17.000 m

2011

The Track Installation Project of Marmaray and LVT Block Production
28.325 m

First Turn - Key High Speed Track Laying and Sleeper Delivery for Ankara - Konya High Speed Train Project
776.000 pcs

Bir Touta - Sidi Abdallah - Zeralda Railway Line
46.000 m

2012

Gökçedağ - Nusrat Railway Rehabilitation Project
110.000 m

2013

Hasanbey Logistics Center Construction
13.000 m

Construction of Second Line Between Tekirdağ Port and Muratlı
31.000 m

Unique Manufacturer of Slab Track in Turkey for Çatalca Tunnel - Istanbul
425 m

For Sidi Bel Abbes - Sétif Tramway, Technical Support and TW - 120 Types Blocks Production for Ballastless Track
41.000 m

2013

Official Subcontractor of Awash-Weldia Railway Project Trackworks Construction
420.000 m

the greatest work has been received by a Turkish contracting company alone until that, 450 km

Marmaray BC1 Bosphorus Project
28.325 m

2015

Renewal of Bozkurt - Dinar in Konya
75.000 m

Internationally Qualification of Afyon Laboratory

2016

Rehabilition and Signalization of Irmak - Karabük Zonguldak Project
425.000 m

Antalya Tramway Line
23.843 m

Konya  Adliye Tramway
18.000 m

2017

Mechanized Maintenance Works with Ballast Cleaning  for  Between Track Section Ulukışla and Çiftehan
30.000 m

2018

Yerköy - Sivas High Speed Line Superstructure and Electromechanic Works
517.000 m

Standard Gauge Railway (SGR) Line Between Dar es Salaam - Morogoro
301.000 m

Morogoro - Makatupora Track Installation
418.837 m

2018

TER Dakar - AIBD M1 Trackwork Design and Constrution Planning Works
87.000 m

TÜBİTAK - SAGE Test Line
2.000 m

Track Renewal Work on Irmak - Tüney and Çankırı - Kurşunlu Line
364.000 m