Awash - Kombolcha - Hara Gebaya Railway Line ETHIOPIA
Project Start - End Dates 06.2014/On-going
Line Length 428 km
Switch Type and Quantity 1/12 R=500, 37 Units
1/9 R=300, 69 Units
   
Sleeper Type B58 - 2.5
Sleeper Quantity 700.000
Dar es Salaam - Morogoro - Makutupora Railway Line TANZANIA
Project Start - End Dates 05.2018/On-going
Line Length 558 km
Switch Type and Quantity 1/24 R:1320, 13 Units
1/9 R:300, 155 Units
1/12 R:1500, 47 Units
   
Sleeper Type Heavy Haul, Turnout and Bridge
Sleeper Quantity 1.200.000
Yerköy - Sivas High Speed Railway Line TURKEY
Project Start - End Dates 05.2018/On-going
Line Length 417 km Ballasted and 101 km Ballastless Track
Switch Type and Quantity 1/12 R:500, 20 Units 
1/9 R:300, 13 Units
1/24 R:2600/1600, 42 Units
1/18.5 R:1200, 27 Units
   
Sleeper Type B07, B320, Turnout and Rayton Slab Track
Sleeper Quantity 730.000
Irmak - Karabük - Zonguldak Railway Rehabilitation Project TURKEY
Project Start - End Dates 07.2017/01.2018
Line Length 415 km Mainline, 65 km Siding
Switch Type and Quantity 1/9 - R:300, 200 Units
   
Sleeper Type B58-2.4
Sleeper Quantity 24.458
Ankara - Konya High Speed Railway Line TURKEY
Project Start - End Dates 11.2008 - 08.2011
Line Length 465 km
Switch Type and Quantity 1/9 R:300, 2 Units
1/12 R:500, 46 Units
1/29 R:300, 10 Units
1/46 R:3550, 28 Units
   
Sleeper Type B70
Sleeper Quantity 766.000
Marmaray BC 1 TURKEY
Project Start - End Dates 2011/2013
Line Length 3 km Ballasted and 26 km Direct Fixation
Switch Type and Quantity 1/7 R:140, 7 Units
1/9 R:300, 5 Units
   
Sleeper Type B70 and LVT Block
TÜBİTAK - SAGE Test Campus TURKEY
Project Start - End Dates 06.2017/09.2018
Track Length 2 km Supersonic Sled Test Track
Design Criteria 1000 kg/1.5 Mach
Max Speed 4.5 Mach
Max Payload 3500 kg
Fastening System Special Yapıray Design
Buildings Control Building
Data Building
Energetic Material Depots
Administration Buildings

Project Locations

38.963745

35.243320

0

Turkey

28.033886

1.659626

1

Algeria

9.145000

40.489674

2

Ethiopia

31.791702

-7.092620

3

Morocco

14.497401

-14.452362

4

Senegal

-6.369028

34.888821

5

Tanzania

All Projects

İzmir Metro Turkey, 1998 - 2000
Kadıköy-Moda Nostalgic Tramway Turkey, 2002 - 2003
ESTRAM-Eskişehir Tramway Turkey, 2003 - 2004
Beyoğlu Nostalgic Tramway Turkey,  2002 - 2003
Ankara Metro 3. Phase, Line Works Turkey, 2003 - 2007
Galata Bridge Tram Laying Works Turkey, 2003 - 2004
Eminönü-Sirkeci Tramway Turkey, 2004 - 2005
Zeytinburnu-Bağcılar Tramway Turkey, 2004 - 2006
Taksim-Kabataş Funicular Turkey, 2005 - 2006
Kayseri Tramway Turkey, 2006 - 2009
Ankara-Konya High Speed Railway Line Turkey, 2008 - 2011
Hasanbey Logistic Center Trackwork Turkey, 2011 - 2013
Tekirdağ-Muratlı Line Works Turkey, 2011 - 2013
Marmaray BC 1 Turkey, 2011 - 2013
Bozkurt-Dinar Railway Line Turkey, 2013 - 2015
Konya Tramway Turkey, 2013 - 2015
Sidi Bel Abbes Tramway Algeria, 2013 - 2017
Sétif Tramway Algeria, 2014 - On-going
Awash-Kombolcha-Hara Gebaya Railway Line Ethiopia, 2014 - On-going
Casablanca Tramway Morocco, 2016 - On-going 
TÜBİTAK-SAGE Test Campus Turkey,   2017 - 2018
Irmak-Karabük-Zonguldak Railway Rehabilitation Project Turkey,   2017 - On-going
Ter Dakar M1 Railway Project Senegal, 2018 - On-going
Kayaş-Yerköy Sleeper and Slab Track Production Turkey,   2018 - On-going
Dar es Salaam-Morogoro-Makutupora Railway Line Tanzania, 2018 - On-going
Yerköy-Sivas High Speed Railway Line Turkey,   2018 - On-going

 

Beyoğlu Nostalgic Tramway

Beyoğlu Nostalgic Tramway

Konya Tramway

Konya Tramway

Bozkurt Dinar Railway Track Renewal

Bozkurt Dinar Railway Track Renewal

Taksim Kabataş Funicular System

Taksim Kabataş Funicular System

Eskişehir Light Rail System (Estram)

Eskişehir Light Rail System (Estram)

Casablanca Tramway

Casablanca Tramway

Tekirdağ-Muratlı Line Works

Tekirdağ-Muratlı Line Works

Bozkurt-Dinar Railway Line

Bozkurt-Dinar Railway Line