Makutupora - Tabora - Isaka Railway Line
TANZANIA
Project Start - End Dates 06.2022 - On-going
Line Length 415 km Mainline, 116 km Siding
Switch Type and Quantity 1/24 R:1200, 44 Units
1/9 R:300, 112 Units
   
Sleeper Type Heavy Haul, Turnout and Bridge
Sleeper Quantity 880.000
Rehabilitation of Railway Line from Victoria Falls to Chingola
ZAMBIA
Project Start - End Dates 04.2021 - On-going
Line Length 1029 km
Switch Type and Quantity 1/12 R:500, 108 Units 
1/9 R:300, 80 Units 
   
Sleeper Type P2 Mainline, Turnout
Sleeper Quantity 628.700
Gayrettepe - İstanbul Airport - Halkalı Metro Line
TURKEY
Project Start - End Dates 11.2019 - On-going
Line Length 140 km
Sleeper Type / Slab Track Type Panelray PST-M (E65)
Panelray PST-M (E70)
Panelray PST-M (E75)
   
Slab Track Quantity 31.500
Walkway for Tunnel Rayton AEWS
(Adjustable eleveted walkway system)
Dar es Salaam - Morogoro - Makutupora Railway Line
TANZANIA
Project Start - End Dates 05.2018 - On-going
Line Length 541 km Mainline, 181 km Siding
Switch Type and Quantity 1/24 R:1200, 49 Units
1/9 R:300, 188 Units
   
Sleeper Type Heavy Haul, Turnout and Bridge
Sleeper Quantity 1.200.000
Awash - Kombolcha - Hara Gebaya Railway Line
ETHIOPIA
Project Start - End Dates/Phase-1 01.2016 - On-test stage
Project Start - End Dates/Phase-2 03.2018 - On-going
Line Length Phase-1 / 270 km  Phase-2 / 158 km
Switch Type and Quantity 1/12 R:500, 38 Units
1/9 R:300, 63 Units
   
Sleeper Type B58 - 2.5
Sleeper Quantity 710.000
Yerköy - Sivas High-Speed Railway Line
TURKEY
Project Start - End Dates 03.2018 - 12.2021
Line Length 410 km Ballasted Track and 96 km Ballastless Track
Switch Type and Quantity 1/25.5 R:2500, 25 Units
1/23.8 R:1500, 6 Units
1/18.5 R:1200, 20 Units
1/12 R:500, 20 Units
1/9 R:300, 26 Units
   
Sleeper Type B07 and B320 Panelray PST
Sleeper Quantity B07 - 685.000
B320 - 2.400
Panelray PST - 20.000
TÜBİTAK - SAGE Test Campus
TURKEY
Project Start - End Dates 06.2017 - 12.2017
Track Length 2 km Supersonic Sled Test Track
Design Criteria 1000 kg/1.5 Mach
Max Speed 4.5 Mach
Max Payload 3500 kg
Fastening System Special Yapıray Design
Buildings Control Building
Data Building
Energetic Material Depots
Administration Buildings
Irmak - Karabük - Zonguldak Railway Rehabilitation Project
TURKEY
Project Start - End Dates 12.2012 - 12.2016
Line Length 415 km Mainline, 65 km Siding
Switch Type and Quantity 1/9 R:300, 200 Units
   
Sleeper Type B58 - 2.4
Sleeper Quantity 24.500
Marmaray BC 1
TURKEY
Project Start - End Dates 06.2011 - 10.2013
Line Length 3 km Ballasted and 26 km Direct Fixation
Switch Type and Quantity 1/9 R:300, 5 Units
1/7 R:140, 7 Units
   
Sleeper Type B70 and LVT Block
Ankara - Konya High Speed Railway Line
TURKEY
Project Start - End Dates 11.2008 - 08.2011
Line Length 465 km
Switch Type and Quantity 1/9 R:300, 2 Units
1/12 R:500, 46 Units
1/29 R:300, 10 Units
1/46 R:3550, 28 Units
   
Sleeper Type B70
Sleeper Quantity 766.000

Project Locations

38.963745

35.243320

0

Turkey

28.033886

1.659626

1

Algeria

9.145000

40.489674

2

Ethiopia

31.791702

-7.092620

3

Morocco

14.497401

-14.452362

4

Senegal

-6.369028

34.888821

5

Tanzania

All Projects

Bursa Emek-City Hospital Hrs Project Prefabricated Reinforced Concrete Railway Panel (PST-M) Supply and Railway Trackworks Assembly Works

Turkey, 2023 - On going

Romania/Bucharest 11 Lot Maintenance Works Romania, 2023 - On going
Extension of Tramway Track Between Ilidža-Hrasnica in Bosnia and Herzegovina Bosnia and Herzegovina, 2023 - On going
Bandırma-Bursa-Yenişehir-Osmaneli High Standard Railway Line Construction Electromechanical Systems Project Superstructure Works                 Turkey, 2022 - On going
Tanzania Lot-4 Tabora-Isaka Railway Project Tanzania, 2022 - On going
Tanzania Lot-3 Makutupora-Tabora Railway Project  Tanzania, 2022 - On going
Superstructure Construction Works on Alayunt-Afyon-Konya Railway Line Section Turkey, 2022 - On going
Halkalı-İstanbul Airport Metro Superstructure Works Turkey, 2021 - On going
Zambia Victoria Falls-Chingola Railway Rehabilitation Work Zambia, 2021 - On going
Rumeli Hisarüstü-Aşiyan Funicular Project Turkey, 2021 - 2021
Gayrettepe-İstanbul Airport Subway Superstructure Works  Turkey, 2019 - 2021
Awash-Kombolcha-Hara Gebaya Railway Project Stage-2 Ethiopia, 2018 - On going
Tanzania Lot-2 Morogoro-Makutupora Railway Line Works  Tanzania, 2018 - On going
Tanzania Lot-1 Dar es Salaam-Morogoro SGR Railway Line Works Project  Tanzania, 2018 - On going
Yerköy-Sivas High-Speed Railway Line Turkey, 2018 - 2021
Ter Dakar M1 Railway Project Senegal, 2018 - 2020
Irmak-Tüney ve Çankırı-Kurşunlu Railway Rehabilitation Project Turkey, 2017 - 2022
TÜBİTAK-SAGE Test Campus Turkey, 2017 - 2018
Mechanized Maintenance Works with Ballast Cleaning for Between Track Section Ulukışla and Çiftehan Turkey, 2017 - 2017
Awash-Kombolcha-Hara Gebaya Railway Project Stage-1 Ethiopia, 2016 - On test stage
Antalya II.Stage Light Rail System Project (Meydan-Airport-EXPO) Turkey, 2016 - 2016
Sétif Tramway Algeria, 2014 - 2017
Sidi Bel Abbes Tramway Algeria, 2014 - 2017
Konya Adliye Tramway Turkey, 2013 - 2016
Bozkurt-Dinar Railway Line Turkey, 2013 - 2015
Irmak-Karabük-Zonguldak Railway Rehabilitation Project Turkey, 2012 - 2016
Marmaray BC1 Project Turkey, 2011 - 2013
Tekirdağ-Muratlı Line Works Turkey, 2011 - 2013
Hasanbey Logistics Center Construction Construction Work Turkey, 2011 - 2013
Gökçedağ-Nusrat Railway Rehabilitation Project Turkey, 2011 - 2012
Casablanca Tramway Morocco, 2009 - 2010
Ankara-Konya High Speed Railway Line Turkey, 2008 - 2011
Eskişehir-İnönü High Speed Train Project Turkey, 2008 - 2009
Bursaray Light Metro System Turkey, 2007 - 2010
Konya Tramway (Extension of Selçuk University)  Turkey, 2007 - 2009
Kayseri Tramway Turkey, 2006 - 2009
Sultançiftliği-Edirnekapı Tramway Turkey, 2006 - 2008
Taksim-Kabataş Funicular Turkey, 2004 - 2006
Eminönü-Sirkeci Tramway Turkey, 2004 - 2005
Ankara Metro 3.Phase Line Works Turkey, 2003 - 2007
ESTRAM-Eskişehir Tramway Turkey, 2003 - 2005
Galata Bridge Tramway Laying Works Turkey, 2003 - 2004
Zeytinburnu-Bağcılar Tramway Turkey, 2002 - 2006
Kadıköy-Moda Nostalgic Tramway Turkey, 2002 - 2003
İzmir Metro Turkey, 1998 - 2000

 

Beyoğlu Nostalgic Tramway

Beyoğlu Nostalgic Tramway

Konya Tramway

Konya Tramway

Bozkurt Dinar Railway Track Renewal

Bozkurt Dinar Railway Track Renewal

Taksim Kabataş Funicular System

Taksim Kabataş Funicular System

Eskişehir Light Rail System (Estram)

Eskişehir Light Rail System (Estram)

Casablanca Tramway

Casablanca Tramway

Tekirdağ-Muratlı Line Works

Tekirdağ-Muratlı Line Works

Bozkurt-Dinar Railway Line

Bozkurt-Dinar Railway Line

Bursaray Light Metro System

Bursaray Light Metro System

İzmir Metro

İzmir Metro

Sétif Tramway

Sétif Tramway

Sidi Bel Abbes Tramway

Sidi Bel Abbes Tramway

Hasanbey Logistics Center Construction Construction Work

Hasanbey Logistics Center Construction Construction Work

Eminönü-Sirkeci Tramway

Eminönü-Sirkeci Tramway

İnternet sitemizde, çerez (cookie) kullanılmaktadır. İnternet sitemizde kullanılan çerezler (cookie) hakkında detaylı bilgi almak için www.yapiray.com.tr adresinde yer alan Çerez Politikasını inceleyebilirsiniz. Çerez tutulmasını istemiyorsanız Çerez ayarlarınızı dilediğiniz zaman değiştirebilirsiniz. Devam etmeniz halinde çerez (cookie) kullanımına izin verdiğinizi kabul edeceğiz.

Çerez ayarlarınızı değiştirmeniz halinde internet sitesinin birtakım özelliklerinin kullanamayabileceğinizi belirtmek isteriz.