Sleepers

Slab Tracks

All our mainline sleepers are produced under trademark of Yapıray.
All our bridge and turnout sleepers are produced under trademark of Yapıray.
All our slab tracks are produced under trademark of Yapıray.

  • All information given as part of this website cannot be used, copied or published without the knowledge of YAPIRAY.
  • YAPIRAY reserves the right to change the information within the scope of this website at any time.
  • RAYTON, RAYKAS and PANELRAY are registered brands of YAPIRAY.

PREFABRICATED SLAB TRACKS

  Production Name Rail Type Sleeper Type Quantity Project / Employee
1 Panelray Prefabricated Slab Track 54E1 Slab Track 17.500  Gayrettepe-İstanbul New Airport Metro Line / KKC Marmaray Construction
2 Panelray Prefabricated Slab Track 60E1 Slab Track 1.210  Panelray® FCA Production for Tunnel Rehabilitation in Bulgaria Koprivishitsa Stryma / Bulgaria
3 Panelray Prefabricated Slab Track 54E1 Slab Track 15.340  Halkalı-İstanbul New Airport Metro Line / KKC Marmaray Construction
4 Panelray Prefabricated Slab Track 54E1 Slab Track 303  Rumeli Hisarüstü-Aşiyan Funicular Line / Metrostav Ankara Construction
5 Panelray Prefabricated Slab Track 60E2 Slab Track 8.740  Kayaş-Yerköy High Speed Train Line / TCDD
6 Panelray Prefabricated Slab Track 60E2 Slab Track 21.000  Yerköy-Sivas High Speed Line / TCDD
7 Panelray Prefabricated Slab Track 60E2 Slab Track 21.452  Bandırma-Osmaneli High Standard Railway Line / Kalyon Construction        (On-going)

MAINLINE SLEEPERS

  Production Name Rail Type Sleeper Type Quantity Project / Employee
1 HH (Heavy Haul) Prestressed Concrete Sleeper 60E1 Monoblock 668.600 Tanzania Morogoro-Makutupora Railway Line / Tanzania
2 HH (Heavy Haul) Prestressed Concrete Sleeper 60E1 Monoblock 459.290 Tanzania Dar Es Salaam-Morogoro Railway Line / Tanzania
3 B70 Prestressed Concrete Sleeper 60E1 Monoblock 50.000 Balıkesir-Susurluk Project / TCDD
4 TW120 41GPU Bi Block 44.640 Sidi Bel Abbes Tramway Line / Algeria
5 B70 Prestressed Concrete Sleeper 60E1 Monoblock 60.000 Alayunt-Konya Railway Project / TCDD
6 HH (Heavy Haul) Prestressed Concrete Sleeper 60E1 Monoblock 567.000 Tanzania Makutupora-Tabora Railway Line / Tanzania (On-going)
7 B58 Prestressed Concrete Sleeper 54E1 Monoblock 441.000 Awash-Weldia Railway Project Trackworks Construction
8 B70 Prestressed Concrete Sleeper 60E1 Monoblock 40.000 ALSTOM Transport / Papua New Gine Mine Line
9 B58 Prestressed Concrete Sleeper 49E1 Monoblock 31.000 Antalya Tramway / Algeria
10 TW120 41GPU Bi Block 46.989 Setif Tramway / Algeria
11 YMPFB Block 60Ri Block 85.750 ESTRAM-Eskişehir Tramway Line
12 B58 Prestressed Concrete Sleeper 49E1 Monoblock 199.576 Track Renewal Work on Irmak-Tuney-Kurşunlu / TCDD
13 B07 Prestressed Concrete Sleeper 60E2 Monoblock 650.000 Yerköy-Sivas High Speed Line / TCDD
14 B07 Prestressed Concrete Sleeper 60E2 Monoblock 430.000 Kayaş-Yerköy High Speed Train Line / TCDD
15 B70 Prestressed Concrete Sleeper 60E2 Monoblock 30.000 Kayaş-Yerköy High Speed Train Line / TCDD
16 B70 Prestressed Concrete Sleeper 60E1 Monoblock 708.080 Ankara-Konya YHT Line / TCDD
17 B70 Prestressed Concrete Sleeper 60E1 Monoblock 23.000 Hasanbey Logistics Center / TCDD
18 Sonneville LVT Block 60E1 Block 90.500 Marmaray BC1 / TGN JV
19 Bridge Sleeper 54E1 Bridge 17.500 Awash-Weldia Railway Project Trackworks Construction
20 HH (Heavy Haul) Bridge Sleeper 60E1 Bridge 19.500 Tanzania Dar Es Salaam-Morogoro-Makatupora Railway Line Tanzania
21 B07 Prestressed Concrete Sleeper 60E2 Monoblock 564.384 Bandırma-Osmaneli High Standard Railway Line / Kalyon Construction (On-going)
22 B70 Prestressed Concrete Sleeper 60E2 Monoblock 860.000 Mersin-Gaziantep High Standard Railway Line / Rönesans Construction (On-going)

TURNOUT SLEEPERS

  Production Name Rail
Type
Sleeper
Type
Quantity Project / Employee
1 Turnout Sleeper 60E1 1/9 R:300 17.580 m TER Dakar AIDB / Senegal
2 Turnout Sleeper 60E1 1/9 R:300 83.320 m Tanzania Dar Es Salaam-Morogoro Railway Line / Tanzania
3 Turnout Sleeper 60E1 1/9 R:300 61.515 m Tanzania Morogoro-Makutupora Railway Line / Tanzania
4 Turnout Sleeper 60E1 1/9 R:300 40.141 m Etihad Railway Line Project (On-going)
5 Turnout Sleeper 60E1 1/9 R:300 21.000 m Krizhevci-Koprivnica-Hungary Border Railway Line / MZA Construction
6 Turnout Sleeper 60E2 1/9 R:300 68.195 m Bandırma-Osmaneli High Standard Railway Line / Kalyon Construction
7 Turnout Sleeper 60E1 1/9 R:300 42.060 m TCDD (Production Between 2020-2022)
8 Turnout Sleeper 60E2 1/9 R:300 18.850 m Alayunt-Konya Railway Project / TCDD
9 Turnout Sleeper 49E1 1/9 R:300 24.200 m Rehabilition and Signalization of IKZ Project / TCDD
10 Turnout Sleeper 54E1 1/9 R:300 24.442 m Awash-Weldia Railway Project Trackworks Construction
11 Turnout Sleeper 60E1 1/9 R:300 17.182 m VAE Turnout / Turkey Plant
12 Turnout Sleeper 60E1 1/9 R:300 2.420 m Renewal of Bozkurt-Dinar / TCDD
13 Turnout Sleeper 60E1 1/9 R:300 726 m Rehabilition and Signalization of IKZ Project / TCDD
14 Turnout Sleeper 60E1 1/9 R:300 19.118 m Hasanbey Logistics Center / TCDD
15 Turnout Sleeper 60E1 1/9 R:300 1.694 m Tekirdağ - Muratlı Railway Line / TCDD
İnternet sitemizde, çerez (cookie) kullanılmaktadır. İnternet sitemizde kullanılan çerezler (cookie) hakkında detaylı bilgi almak için www.yapiray.com.tr adresinde yer alan Çerez Politikasını inceleyebilirsiniz. Çerez tutulmasını istemiyorsanız Çerez ayarlarınızı dilediğiniz zaman değiştirebilirsiniz. Devam etmeniz halinde çerez (cookie) kullanımına izin verdiğinizi kabul edeceğiz.

Çerez ayarlarınızı değiştirmeniz halinde internet sitesinin birtakım özelliklerinin kullanamayabileceğinizi belirtmek isteriz.