GOAL
ORIENTED

Progress

YAPIRAY’s main objective is to fulfil railway constructions in the most efficient and accurate way with its huge experience in managing various projects under tough and challenging conditions simultaneously. Yapıray, which has high goals, always keeps alive the desire for continuous growth, which will carry this basic goal one step further.

IMPROVE
SUSTAIN

Rehabilitate

Track rehabilitation is essential to achieve the sustainability of railway line operations. In consequently, YAPIRAY is ready to renew the railway lines across the globe. To the present, rehabilitation of 500 km railway lines has been a magnificent experience and success for YAPIRAY.

DESIGN
DEVELOP

Inovation

Need-based products are the backbone of research and development for us. Thanks to our 20 years of knowledge in railway engineering, tailor-made solutions for each customer are provided by our in-house design department. YAPIRAY response to customer needs with innovative solutions including but not limited to European Norms, UIC and AREMA standards.

1998

YAPIRAY is established by Yapı Merkezi

2000

Bursa LRT System Phase I
40.300m

İzmir LRT System Phase I (Üçyol-Konak-Basmane)
23.200m

2002

Kadıköy-Moda Nostalgic Tramway Project
2.938m

2004

First Track Laying Project on Galata Opening Bridge: Eminönü - Kabataş Tramway Project
1.187m

2005

First Special Design Work: Marmaray BC1 Line Works Design Project

Eskişehir Tramway Project
32.550m

UITP World Light System Award with Eskişehir Tramway

2006

Zeytinburnu-Bağcılar Tramway Line
11.500m

Track Construction of Taksim-Kabataş Funicular Line
1.280m

2007

Ankara Metro Track Works
31.000m

First Track Panel Prefabrication Project for Ankara-Istanbul
234.000m

2008

Sultançiftliği-Edirnekapı Tramway
30.600m

Eskişehir-Inönü High Speed Train Project Resources
60.000m

First Production of Railway Sleepers

2009

Konya Tramway Extension of Selçuk University
4.600m

Kayseri Light Rail System Project
35.630m

2009

UITP World Light System Award with Kayseray

Eskişehir-İnönü High Speed Train Project
11.200m

2010

Casablanca Tramway
40.000m

Caroubier Storage Area
10.000m

Bursaray Second Stage Light Rail System Project
17.710m

Dubai Metro Project Line Works
75.000m

2011

Ankara Konya High Speed Train Project Track Works and Traverse Production 776.000 B70 Production 465.600 Line Works

2012

Gökçedağ-Nusrat Railway Rehabilitation Project
110.000m

2013

Hasanbey Logistics Center Construction Construction Work
13.000m

Construction of Second Line Between Tekirdağ Port and Muratlı
31.000m

Special Design Ballast-free Line Panelray (slab track) Production for Istanbul Çatalca Tunnel in Turkey
425m

2013

For Sidi Bel Abbes-Sétif Tramway, Technical Support and TW-120 Types Blocks Production for Ballastless Track
41.000m

The Largest Railway Project Built in abroad by a Turkish Contracting Company

Marmaray BC1 Track Works and LVT Block Production Project
28.325m

2015

Renewal Railway Road between Bozkurt-Dinar
75.000m

Internationally Qualification of Afyon Laboratory

2016

Rehabilition and Signalization of Irmak-Karabük Zonguldak Project
425.000m

Antalya II. Stage Light Rail System Project (Airport-Airport-EXPO) 23.843m
23.843m

2016

Konya Adliye Tramway Line
18.000m

Buraj Service Work with Izmir Metro Machine
35.000m

TCDD Mechanical Repair Works
110.296m

2017

Mechanized Maintenance Works with Ballast Cleaning  for  Between Track Section Ulukışla and Çiftehan
30.000m

2018

TÜBİTAK-SAGE Test Line
2.000m

TER Dakar AIDB Construction Planning Works
87.000m

Awash-Kombolcha-Hara Gebaya Railway Project Stage-1
309.701m (On test stage)

2018

Tanzania Lot-1 Dar es Salaam-Morogoro SGR Railway Line Works Project
301.000m (On going)

Tanzania Lot-2 Morogoro-Makutupora Railway Line Works 418.837m (On going)
418.837m (On going)

Awash-Kombolcha-Hara Gebaya Railway Project Stage-2
118.092m (On going)

2021

Yerköy-Sivas High Speed Train Project Ballasted and Non-Ballasted Line Works
517.000m

Rumeli Hisarüstü-Aşiyan Funicular Project PST-F Production and Line Works
805m

Gayrettepe-İstanbul Airport Metro PST-M Production and Superstructure Works
79.000m

2021

Halkalı-İstanbul Airport Metro PST-M Production and Superstructure Works
68.000m (On going)

Zambia Victoria Falls-Chingola Railway Rehabilitation Project
1.000.000m (On going)

2022

Irmak-Tüney and Çankırı-Kurşunlu Line Renewal Works
364.000m

Alayunt-Afyon-Konya Railway Project Superstructure Works 
36.000m (On going)

2022

Tanzania Lot-3 Makutupora-Tabora Railway Project
368.000m (On going)

Tanzania Lot-4 Tabora-Isaka Railway Project
163.000m (On going)

2022

Bandırma-Bursa-Yenişehir-Osmaneli High Standard Railway Line Construction Electromechanical Systems Project Superstructure Works
436.140m (On going)

2023

Romania/Bucharest 11 Lot Maintenance Works
47.200m (On going)

Extension of Tramway Track Between Ilidža-Hrasnica in Bosnia and Herzegovina
12.961m (On going)

Bursa Emek-City Hospital Hrs Project Prefabricated Reinforced Concrete Railway Panel (PST-M) Supply and Railway Trackworks Assembly Works
9.940m (On going) 

Numbers Tell The Real Story



High Invesment Budget for R&D

750 Employees

Sleeper Production: 1.350.000 pcs/year
Slab Track Production: 20.000 pcs/year

300 km/h in High Speed Lines

Supersonic Sled Test Track 1,5 Mach (1850 km/h)

Know-How

Completed: 5.2 Million Meters
On-going: 2 Million Meters

10 Countries 3 Continents

Accreditation and Management Systems - Certifications

İnternet sitemizde, çerez (cookie) kullanılmaktadır. İnternet sitemizde kullanılan çerezler (cookie) hakkında detaylı bilgi almak için www.yapiray.com.tr adresinde yer alan Çerez Politikasını inceleyebilirsiniz. Çerez tutulmasını istemiyorsanız Çerez ayarlarınızı dilediğiniz zaman değiştirebilirsiniz. Devam etmeniz halinde çerez (cookie) kullanımına izin verdiğinizi kabul edeceğiz.

Çerez ayarlarınızı değiştirmeniz halinde internet sitesinin birtakım özelliklerinin kullanamayabileceğinizi belirtmek isteriz.